Which mistakes cause the most trouble in a tub-to-shower conversion?
The costly mistakes in a tub to shower conversion fall into two groups. The first group involves permits, inspections and code: skipping the permit, a shower floor and liner that fail the flood test, and a shower valve that doesn’t meet code. The second group is work that’s hard to reverse once the walls and floor are finished: leaving out blocking for grab bars and building a curbless entry without the floor work it needs. A separate contracting mistake is signing with no written scope.
Other choices are judgment calls that depend on your home and your plans. These include removing the only tub in the house, choosing a curbed or curbless entry, and picking tile or panels. The sections below cover the code items first, then the decisions that are hard to undo, and then how to compare quotes and check a contractor. The advice is written for homes in Pensacola, Gulf Breeze, Navarre and Milton, where Gulf Coast humidity and local permitting change some of the answers.
Do you need a permit to convert a tub to a shower?
You should assume you do. For the unincorporated area of Escambia County, the county’s building services FAQ cites Chapter 1 of the Florida Building Code and section 553.79(1), Florida Statutes, and says anyone who wants to alter or repair a building, or install, alter, remove, convert or replace a plumbing or electrical system regulated by the technical codes, must first apply for and get a permit. That rule is general, but Escambia County also lists replacing a bathtub with a shower under its Plumbing Fixture Permit, so it’s the right place to start.
Santa Rosa County says a permit is most often required except for minor repairs, and it lists plumbing and electrical among its permit types. If you live in Gulf Breeze, the city says building in the City of Gulf Breeze also requires a Santa Rosa County building permit. In Milton, check with the city and with Santa Rosa County before work starts.
Inside Pensacola city limits, the city requires an alteration permit for bathroom remodels in which all cabinets and plumbing, gas or electrical fixtures are removed, and also when sheetrock comes off to rough in the subtrades. Starting July 1, 2026, the city exempts non-structural work on a single-family home valued under $7,500 from permitting. The exemption isn’t automatic, though. You apply through MGOConnect with the city’s form, a detailed scope of work and your signed contract, and you pay a $40 administrative fee. The City of Pensacola building department can tell you whether a particular conversion qualifies. On Academy Construction projects, we pull the plumbing permit and the work goes through county inspection. Depending on where you live and what the job includes, other permits may also apply.
What does the inspector check in the shower floor and drain?
On a permitted job, the shower floor can be one of the items that gets tested. A Florida Home Builders Association builder training course, not a county inspection list, includes a shower liner test (P2503.6) in the residential plumbing rough-in inspection. In that test, the installer plugs the drain and fills the lined floor to at least 2 inches at the threshold, and the water must hold at least 15 minutes with no leaks. At the plumbing final, the same course says inspectors check fixtures for proper traps and water test them.
Size and slope matter too. Miami-Dade County’s plumbing inspection guideline isn’t Pensacola-area guidance or the code text, but it shows the kinds of items inspectors may look for. It tells inspectors to check that shower pans are made of approved ASTM D4068 or D4551 material and are at least 900 square inches, and to check for proper slope to shower receptors under FBC-R P2709.3. The guideline doesn’t give slope numbers. It does make clear that footprint, pan material and slope are inspection items, which means a large glass panel doesn’t make slope optional. Local inspectors may check things differently, so ask your building department what its inspectors look for.
Many homeowners ask whether the old tub drain can be reused under a new shower pan. Before demo, ask a licensed plumber or the building department whether the existing trap will work under the new shower. Don’t assume the old drain will pass.
What actually keeps water out of the walls and floor?
Where a tiled shower floor is made watertight with a liner, the completed liner installation is what gets tested for leaks, as the flood test above shows.
The reason this layer matters is mold. The EPA says the key to mold control is moisture control. It also warns that mold can grow on or fill in the spaces and crevices of porous materials, so it may be difficult or impossible to remove completely. Water that gets behind the shower surface and into the wall is exactly the kind of moisture you don’t want trapped in a humid Gulf Coast house.
So ask every bidder what goes behind and under the tile, which membrane or liner they use, and how far up the walls it runs. If a bid doesn’t name a membrane or liner, ask what serves as the waterproof layer, how it’s sealed at seams, corners, pipe penetrations and the drain, and whether it will be flood-tested.
Anti-scald valves are code requirements
The Florida Building Commission says the 8th Edition (2023) Florida Building Code took effect December 31, 2023, and Okaloosa County’s notice adds that permit applications submitted after that date must comply with it. The residential volume was updated from the 2021 International Residential Code.
The FHBA course quotes FBC-R P2708.4 as requiring shower and tub/shower valves to be pressure-balance, thermostatic-mixing or combination types, with a high-limit stop meeting ASSE 1016/ASME A112.1016/CSA B125.16 set to no more than 120°F (49°C). The plumbing volume adds that shower valves must be rated for the flow rate of the installed showerhead. So settle your showerhead setup before the valve is chosen.
What does a curbless shower really require?
A curbless shower takes more than laying tile flush with the bathroom floor. TileLetter, the trade magazine of the National Tile Contractors Association, describes two TCNA Handbook curbless details, B421C and B422C. In these concrete-slab details, both require a depressed concrete slab, provided by other trades, so a mortar bed can slope 1/4 inch per foot toward the drain under a bonded waterproof membrane.
Those details also extend the waterproofing outside the immediate shower area. The membrane must run continuously from the drain to the full height of the tile, and the floor and wall waterproofing must continue one foot beyond the floor’s high point outside the shower, but not beyond the tiled area. Because no curb holds the water back, a secondary drain may be required where shower and splash water aren’t effectively evacuated.
According to TileLetter, curbless typically involves floor work to create slope. On a concrete slab, the TCNA details call for a depressed concrete slab that extends beyond the shower area. For wood-framed floors, TileLetter mentions one approach some installers use: recessing the subfloor between the joists, rather than cutting them, to get slope. That comes from a trade magazine, not the code or the TCNA Handbook. Treat that as industry practice, not a requirement. Ask your contractor and the building department what it would take. If lowering the floor isn’t practical, a low threshold or a standard curb may serve you better. Mobility-minded homeowners should weigh that choice early, because it affects the whole schedule.
Add grab-bar blocking while the walls are open
Even if you don’t want grab bars yet, put solid blocking in the walls before they close. Schluter says grab bars installed over its KERDI-BOARD foam panels must be anchored in the structure or solid blocking behind the board. Other wall systems have their own instructions, so check the manufacturer’s rules for whatever you choose.
The U.S. Access Board’s guide to the ADA Standards is cited here as a reference for strength and placement. Confirm any accessibility requirements for your project with the building department. The guide says grab bars, fasteners, mounting devices and supporting structure must withstand a vertical or horizontal force of 250 lbs. at any point. For dwelling units covered by those Standards, it says grab bars aren’t required at showers or tubs if the walls are properly reinforced for later installation, which is exactly what blocking does.
For placement, the guide gives a shower grab-bar height of 33 to 36 inches. It treats the 1-1/2-inch gap between bar and wall as an exact dimension, not a minimum, to prevent entrapment, and says bars can’t rotate in their fittings. In alternate roll-in shower compartments, it puts bars on the back wall and the side wall farther from the entry. Tell your contractor where you might want bars, and decide about a bench or niches at the same time.
Ventilation and materials for Gulf Coast humidity
Pensacola-area bathrooms deal with humid air for much of the year, so plan ventilation as part of the conversion. For mold that keeps coming back in a shower, the EPA says more ventilation and more frequent cleaning usually prevent it or keep it to a minimum. Replacing a weak fan is easiest while the ceiling and walls are already open. Ask each bidder whether the existing fan stays or gets replaced, where it vents, and whether it meets current code. The building department can confirm what’s required.
Wall material is the other humidity decision. Tile over a waterproof membrane is one route, and grout-free solid-surface panels are another. Panels remove grout upkeep, but they still need regular cleaning. Swan’s guide for its solid-surface shower walls says to clean regularly with common household liquid cleaners, and the company also says its Swanstone wall panels will not mold or mildew and have no grout to clean, and the company backs them with a Limited Lifetime residential warranty. Those are the manufacturer’s own claims for its product. The same spec sheet says not to use leave-on cleaners such as automatic shower sprays, so if you rely on a daily spray, plan to change that habit with these panels.
Should you remove the only tub in the house?
Whether to keep a tub is a judgment call, and the research for this article has no data on how it affects resale. What the data does show is what homeowners and designers are choosing. In the 2026 Houzz Bathroom Trends Study of 1,619 renovating homeowners, a bathtub came out in 26% of projects, and 79% of those homeowners used the space to enlarge the shower. In NKBA’s 2026 survey of designers, manufacturers, remodelers and architects, 55% said enlarging the shower is more important to their customers than including a bathtub in the primary bath.
Those numbers reflect preferences, not what buyers will pay. If you plan to sell in the next few years and this is the only tub in the house, ask a local real estate agent whether keeping a tub elsewhere matters for homes like yours.
What should a quote include, and what drives the cost?
Santa Rosa County advises homeowners to get more than one bid, and bids are only comparable when each one is written and itemized. The county lists a verbal-only contract among its warning signs. Before you compare prices, make sure every bid answers the same questions:
- The bid names the shower system, the membrane or liner, and the wall material.
- The bid names the valve type and the showerhead or handheld it’s rated for.
- The bid states the glass type.
- The bid says whether blocking, a bench, niches or a new fan are included.
- The bid says who pulls the permit and who files the Notice of Commencement.
The Notice of Commencement comes from Chapter 713 of the Florida Statutes, not a city rule. The City of Pensacola says improvements greater than $5,000 require a Notice of Commencement filed with the Clerk of Courts, and no inspections can be scheduled until a copy is uploaded. Outside the city, ask your building department how it handles the notice.
We don’t have verified local prices to share for the Pensacola area. Ask each contractor to explain what drives their number, including the system you choose (a prefab base, grout-free panels or tile over a membrane), any curbless floor work, plumbing changes, and damage found once the tub comes out. The research also doesn’t show how often rot turns up behind tubs, so ask each contractor how the contract prices damage found after demo, and keep some room in your budget for it.
Academy Construction gives a written scope with itemized pricing and a realistic schedule before demo day. A standard conversion with grout-free materials typically runs 3–5 working days, assuming no hidden damage or major plumbing changes. We share the schedule before demo starts. At the end, we walk the finished job with you, take care of punch-list items before final payment, and provide written warranty documentation for our labor along with the manufacturer’s paperwork.
How to check a contractor before you sign
Santa Rosa County’s list of warning signs is a useful starting point, but confirm local requirements with your own building department. The county lists a contractor who tells you a permit isn’t required as a warning sign. A copy of a Business Tax Receipt doesn’t count as a license either, because Florida requires a state certification, state registration or specialty trade license in the field the person is contracting in.
Ask for proof of insurance, since a licensed contractor in Santa Rosa County is required to have workers’ compensation and general liability insurance. Be wary if a contractor asks you to pull the permit. The county says the permit holder is responsible for making any changes needed to pass inspections, which means the corrections would fall on you. The risks of skipping these checks are real, because hiring an unlicensed contractor can result in a cease and desist order and fines.
If something goes wrong after you hire, you have recourse. The City of Pensacola notes that homeowners can file a complaint against a contractor’s license for fraud, misconduct, negligence or abandonment of contracted duties.
Getting started
Settle the judgment calls first: whether to keep a tub, which entry you want, and which shower system fits your budget and how much upkeep you’re willing to do. Then ask every bidder the same questions about the permit, the membrane, the valve, the glass, blocking and ventilation, and get the answers in writing before you compare prices. If you’d like help weighing those choices, Academy Construction is licensed and insured and offers a free in-home bathroom remodeling consultation.