How Long Does It Take to Install a Walk-In Shower?

How Long Does It Take to Install a Walk-In Shower

How Long Does It Take to Install a Walk-In Shower? (And How Could It Affect Resale Value)

Quick Answer: One week and improves resale value

How long does it take to install a walk in shower?

If the drain is not being moved and there are no permits, it could take one day.  However, you will likely need (and want) permits and there will likely be small modifications to the drain position as well as needing to change the drain size and P-Trap side if there was formerly a tub/shower combo in the place that you are now building a walk in shower.  With permits, the typical walk in shower build will take one week.  Complications or additional work will bump that out a little bit longer.

In the end, you’re ready to enjoy your new walk in shower. Not only does it greatly improve daily usability, but most people also find that it increases their bathroom’s resale value right away.

Walk in showers have become one of the most requested upgrades for Gulf Breeze, Navarre, and Pensacola homes by Gulf Coast retirees.

The image depicts a modern walk-in shower featuring a sleek glass enclosure and a luxurious rainfall showerhead, all set within a bright white bathroom. This stylish shower system exemplifies the perfect bathroom upgrade, showcasing the potential for shower installation that enhances both aesthetics and functionality.

From Consultation to Construction: Walk-In Shower Lead Times on the Gulf Coast

Lead time from signing a contract until your crew shows up with all their tools is often underestimated by homeowners. It includes everything from finalizing designs, to ordering materials, to submitting for permit, to scheduling the crew.

For walk in shower projects in Pensacola, Gulf Breeze, and Navarre, the lead time is usually 3 to 5 weeks after finalizing the design and materials.  It will likely be faster if using tile because the solid surface walls take approximately 3 weeks to have produced and delivered.

At our in-home consultation, we’ll measure the space and calculate the likelihood of moving the plumbing and drain.  We will discuss various shower wall material options.  Ultimately, you’ll decide what type of materials you prefer.

From Demo to Cleanup: How Many Days Does a Walk-In Shower Installation Take?

The actual construction of a new shower typically takes less time than most homeowners expect. When the plumbing and footprint of your shower remain the same, a standard shower replacement can take between 1 and 2 days with the installation of prefab panels. A walk-in shower may take between 1 and 3 days when these conditions are met. Because some systems use panels, they can be installed in as little as one day. However, Jacuzzi walk-in showers take 1 to 2 days when conditions are right.

Client scheduled a three-day professional installation process for a mid-range shower conversion. During Day 1, your expert team will arrive to perform the demolition of the old tub or existing shower and make any necessary rough plumbing adjustments. Once that is complete and the subfloor is inspected, Day 2 will include the setting of your new shower pan and the installation of cement board or backer board on the walls.

Once the wall system has begun on Day 2, Day 3 will consist of installing the fixtures and the glass enclosure or shower door. Finally, an expert technician will spend the entire last day ensuring everything is caulked, sealed, and cleaned. Then one will be “wow-ed” at the beautiful transformation that has taken place!

Custom tile showers look amazing but take longer to install than conventional tile. Once demolition and prep are done, the tile itself takes 3 to 5 days to set and grout. But the original substrate and waterproofing beneath the surface also require additional time to cure. Plus, add days for glass templating and other special elements. All told, if looking for the most beautiful and functional option for your shower, overall tile shower installation can take 7 to 10 days or more.

The “one-day shower” promotions in ads true only for those that reuse the existing footprint of your bathroom and basic plumbing. These systems use prefab wall panels, they do not involve tile work, and do not include “bathroom remodeling” – only the shower.

Key Factors That Can Speed Up or Slow Down Your New Shower

When it comes to a bathroom remodel, two virtually identical bathrooms can have very different overall timelines depending on hidden conditions and design choices. Here are the factors…

Keeping the same footprint and drain location is ideal, because moving drains–particularly across a concrete slab–requires plumbing work, extra framing, and longer wait times for inspections. Likewise, any hidden damage that’s revealed during demolition could cause a delay of 1 to 3 days while it’s being addressed, such as rotted framing or corroded pipes.

Extra time may be needed for waterproofing to cure and dry fully, especially in humid areas like different parts of Florida. It’s not unusual for membranes and grout to take longer than the manufacturer’s minimum cure periods. Once the tile is completely set and dry, we can begin templating. Glass shower doors usually have a lead time of 2 to 6 weeks.

Permits for structural changes and plumbing upgrades in Escambia and Santa Rosa counties may delay your project for one to several weeks. Change orders will also extend the remodel timeline. Local building codes require inspections during the installations of things like showers, and if you fail inspection, it will take time to correct the issues before re-inspection.

Timely homeowner decisions regarding finishes and fixtures ensure smooth coordination and minimize delays. Every change order after work commences affects procurement and schedule potentially causing delays. Select tile, plumbing hardware, shower type, etc., before demo day to avoid slips.

The image shows various construction tools and materials, including tiles, cement board, and plumbing fixtures, spread out on a bathroom floor as part of a shower renovation project. This scene highlights the installation process for a new shower, emphasizing the preparations needed for tile installation and shower replacement.

The Size and Scope of Your Shower Conversion

The other major timeline driver comes down to project scope. If you replace a tub with a shower pan that fits the tub’s footprint and you are doing it with permits (always recommended) that basic conversion will take about 5 working days once construction starts. Replacing an old shower with a new one in the same layout is generally the fastest turn around.  The only thing faster would be a “one day” type install which would involve no drain repositioning and no permits.

Highly involved shower conversions, removing or moving walls, or curbless entry may take 7 to 14+ working days. Framing and subfloor must be altered, as well as waterproofing. This is sometimes done in older homes in Pensacola and Navarre where bathrooms were built around small tubs. Expanding footprint may require conversions into adjacent closet or hallway.

Larger footprints, more features and a clean, code-compliant job all improve resale value. Many buyers see a dated tub space converted into a bright walk in shower with a bench and grab bar as very “move-in ready.” 

Why Your Remodeler’s Process and Professionalism Matter

An organized contractor puts out a clear start date, the crew shows up on schedule, staged materials in your garage before demo day, and daily cleanup. 

Remodeling a bathroom often starts out with a demolition, and unprofessional 

I’ve known people who’ve had the estimated construction time TRIPLED because the company they hired couldn’t get the people they hired to show up and finish the job.

Find a shower remodeler you can trust by reviewing local reviews. Ask the person who is quoting and designing the solution with you if they will personally be involved with the project.  

Before you hire a residential restoration contractor, learn about their communication style. They should assign one point of contact to your project and put everything in writing. You should get a realistic timeline of when repairs start and when you can expect completion. 

Handling Hidden Problems and Inspection Delays

What else will we find? Old plumbing doesn’t always comply with current code; and older homes may have undersized drain lines that won’t keep up with modern shower heads, and a lack of clean-outs in the case of a clogged drain. If you have an older Florida home, you know these surprises are possible.

While sometimes adding 1 to 3 days, these changes are non-negotiable if you want your shower to be durable. Repairing a subfloor adds extra labor and materials, but building on a soft, deteriorating floor would be unacceptable to any home inspector in the future.

Regardless of where you live, code enforcement can add short pauses. This is true in Escambia and Santa Rosa counties. Moving drains or a wall calls for rough plumbing inspection. If an inspection fails, it can add considerable delay. Generally, this means likely cutting corners on slope, waterproofing, or fasteners.

Great contractors caution clients about the need for some contingency time to address discovered issues, decide preferred course of action and execution. 

The image depicts an exposed bathroom wall framing and subfloor during a shower demolition, revealing plumbing pipes and the underlying structure. This stage is crucial for shower installation, as it allows for necessary plumbing adjustments and the assessment of any hidden water damage before proceeding with the new shower setup.

How a New Walk-In Shower Can Influence Resale Value

Thinking about updating your bathroom to improve that space? Consider a clean, modern walk in shower. They really do show better during listings and open houses. Here in the Pensacola Bay area, many buyers are looking at up updated bathrooms when selecting their new home.

A bright, low-threshold walk in shower or curbless shower is certainly a dream for many homeowners that are tired of an old, dated and moldy tub/shower. A 2025 Houzz survey reports that 52% of homeowners say they prioritize low-curb showers for safety and sake of aging in place.

Buyers increasingly prefer walk in showers with low threashold curbs, hand held sprayers, shower walls that to not stop at 72″ but instead go all the way to the ceiling, and non slip bases.  Moving forward, all ages of buyers may look for these features, given the trend for families to stay in their homes long term. Barrier-free entries and grab bars appear in NKBA trend reports as standard.

While appraisers seldom assign a separate line-item value, they do consider a new shower in overall bathroom condition and recent remodeling. But in homes with only one tub, you may lessen the home’s appeal to buyers with children. If your house has two or more bathrooms, it’s safe to convert one to a walk in shower — just be sure to keep a tub in the other.

Planning Your Timeline with Academy Construction (Next Steps)

Timing and scheduling can vary based on custom features and availability. 

Whether your project is big or small, the fastest way to get an accurate schedule is with a free consultation. We measure your space, inspect your plumbing and subfloor, talk through tile vs. grout-free options, and provide a written timeline with a realistic completion date. No guesswork, just real answers.

Contact Academy Construction at 850-260-3360 or request your free quote today so you know exactly how long your walk in shower installation will take and how it fits with your remodel or resale plan.